Project Description

Smart Hotel in Co. Louth switches to Renewable Energy

Carnbeg Hotel and Eurotech Renewables reducing energy consumption, lowering operational costs and cutting CO₂ emissions.

Case Study

Project Overview

Project: Sustainable refuge Center

Location: Dundalk, Co. Louth

Technology provided: 80 C High Temperature Hybrid Heating using Air Source Energy

Technology Provider: Eurotech designed, install and commssion Renewable Energy Plant

Sector: Large Scale Accomodation

0%
ENERGY CONSUMPTION REDUCED BY
0 KWH
ANNUAL ENERGY SAVING
0 CO2
ANNUAL TONNES CO2 SAVING
0
ANNUAL SAVINGS TO END USER

High -Temperature – Air to Water Cascade Heat Pump System

System Design: Air Source > Water Source > High Temperature Heating & Hot Water/ 80 C – 75 C COP

Pre- Installed Pipe

External Pipework fitted in prims  zero energy loss piping system, external last pump energy transported into building using solid prims pre-insulated  pipe, and  thermal fusion joints.

Piping System is corrosion resistant – Expansion Resistant and weather  protected.

EuroSmart Control

This Hybrid high temperature heat pump system is operated by EuroSmart Energy Management System.

EuroSmart System Controls circulating pumps – System Modulation – Heat Pump Modulation – Energy Production Temperature Control -Energy Storage and Fault Management. Eurosmart as programmed to manage the entire System.

Smart Hotel in Co. Louth switches to Renewable Energy

Carnbeg Hotel and Eurotech Renewables reducing energy consumption, lowering operational costs and cutting CO₂ emissions.

Case Study

Project Overview

Project: Sustainable refuge Center

Location: Dundalk, Co. Louth

Technology provided: 80 C High Temperature Hybrid Heating using Air Source Energy

Technology Provider: Eurotech designed, install and commssion Renewable Energy Plant

Sector: Large Scale Accomodation

0%
ENERGY CONSUMPTION REDUCED BY
0 KWH
ANNUAL ENERGY SAVING
0 CO2
ANNUAL TONNES CO2 SAVING
0
ANNUAL SAVINGS TO END USER

High -Temperature – Air to Water Cascade Heat Pump System

System Design: Air Source > Water Source > High Temperature Heating & Hot Water/ 80 C – 75 C COP

Pre- Installed Pipe

External Pipework fitted in prims  zero energy loss piping system, external last pump energy transported into building using solid prims pre-insulated  pipe, and  thermal fusion joints.

Piping System is corrosion resistant – Expansion Resistant and weather  protected.

EuroSmart Control

This Hybrid high temperature heat pump system is operated by EuroSmart Energy Management System.

EuroSmart System Controls circulating pumps – System Modulation – Heat Pump Modulation – Energy Production Temperature Control -Energy Storage and Fault Management. Eurosmart as programmed to manage the entire System.

Key Technical Highlights:

  • Total installed heat pump capacity: 600 kW. Primary Energy fom – 10°C to 80°C

  • Smart Controls manage energy transfer between source energy and system efficiency.

  • Buffer storage maintains a stable energy balance and enables system fluctuations.

  • 75°C flow temperature delivered to radiators at 420% efficiency.

  • Integrated energy meters verify system performance and carbon savings.

  • Endless hot water at 65°C to cater for up to 600 permanent residential and energy efficiency.

  • Improved BER rating increases overall property value.

600 kW fossil-fuel plantroom with the goal of reducing operating costs and carbon emissions. The Eurotech energy survey identified that upgrading to a geothermal high-temperature renewable heating system, combined with advanced smart controls, would deliver the greatest impact with minimal disruption. The installation of the new system, managed through EuroSmart intelligent controls, cut energy consumption and running costs by 45%, while maintaining stable 80°C flow temperatures and ensuring precise heating management across all zones.

• 600 kW fossil-fuel plant-room upgraded to a renewable energy system using Hybrid Eurotech Design.
• High-temperature 80°C qualifying for the SSRH grant using two Air and two Water Source Heat Pumps.
• Zero downtime during changeover to renewable, Eurotech designed the system to transfer from oil to renewable energy by flicking a switch.
• PRIMS piping ensures heat transfer with zero heat transported an external HP with zero heat loss.
• EuroSmart Control Management to transfer of energy mechanically.

MetricBeforeAfterColumn  Reduction / Savings4
Annual Energy Consumption1,200,000 kWh660,000 kWh↓ 45%
Annual Energy Savings540,000 kWhEquivalent to powering approx. 112 homes/year
Annual CO₂ Savings≈ 108 t CO₂(based on 0.20 kg CO₂/kWh)
Annual Cost Savings (to End User)≈ €81,000 / year (based on €0.15/kWh)

 

Benefits achieved:

  • 45% reduction in annual energy consumption through intelligent heating control and renewable energy.

  • 540,000 kWh  energy saved every year, significantly lowering operating costs with zero carbon released on site.

  • €81,000 annual financial savings realized  based on standard commercial energy tariffs

  • 108 tonnes CO₂ reduced annually, improving the site’s environmental performance and perfect for nature.

  • Improved energy performance contributes creating a sustainable business.

  • Enhanced system visibility through real-time monitoring and automated energy production.

  • Increased system reliability, smart scheduling and predictive control to maximize efficiency.

  • Preparation completed to multiply the benefits of micro generation on site.

  • Stronger BER performance, contributing to higher overall property value

600 kW fossil-fuel plantroom with the goal of reducing operating costs and carbon emissions. The Eurotech energy survey identified that upgrading to a geothermal high-temperature renewable heating system, combined with advanced smart controls, would deliver the greatest impact with minimal disruption. The installation of the new system, managed through EuroSmart intelligent controls, cut energy consumption and running costs by 45%, while maintaining stable 80°C flow temperatures and ensuring precise heating management across all zones.

• 600 kW fossil-fuel plant-room upgraded to a renewable energy system using Hybrid Eurotech Design.
• High-temperature 80°C qualifying for the SSRH grant using two Air and two Water Source Heat Pumps.
• Zero downtime during changeover to renewable, Eurotech designed the system to transfer from oil to renewable energy by flicking a switch.
• PRIMS piping ensures heat transfer with zero heat transported an external HP with zero heat loss.
• EuroSmart Control Management to transfer of energy mechanically.

MetricBeforeAfterColumn  Reduction / Savings4
Annual Energy Consumption1,200,000 kWh660,000 kWh↓ 45%
Annual Energy Savings540,000 kWhEquivalent to powering approx. 112 homes/year
Annual CO₂ Savings≈ 108 t CO₂(based on 0.20 kg CO₂/kWh)
Annual Cost Savings (to End User)≈ €81,000 / year (based on €0.15/kWh)

 

Benefits achieved:

  • 45% reduction in annual energy consumption through intelligent heating control and renewable energy.

  • 540,000 kWh  energy saved every year, significantly lowering operating costs with zero carbon released on site.

  • €81,000 annual financial savings realized  based on standard commercial energy tariffs

  • 108 tonnes CO₂ reduced annually, improving the site’s environmental performance and perfect for nature.

  • Improved energy performance contributes creating a sustainable business.

  • Enhanced system visibility through real-time monitoring and automated energy production.

  • Increased system reliability, smart scheduling and predictive control to maximize efficiency.

  • Preparation completed to multiply the benefits of micro generation on site.

  • Stronger BER performance, contributing to higher overall property value